Forge AI · Prepared for Andrew Aiello · Precision Fiber Solutions

Blue helps you
forge further.

You build the network. Blue connects the field to the office. Blue is an AI operations employee that lives on a box at your shop and works over plain text messages. It keeps the 811 book current, builds the daily production sheet, answers spec and safety questions to the page, turns prints into quote inputs, holds the master schedule, and gets what the crews did today to the office today. No app. No login. No network integration required.

What it isOperations employee, on a box at your shop How you use itText messages — any phone, any crew Where it's provenA utility-line contractor's Indy unit, daily Who's behind itForge AI · Bargersville, IN · forgefurther.ai
01 · WHERE THIS FITS

You've built a real company — the office is the easy part to find

Precision is past the stage where the owner is the office. There's a CFO, a safety director, superintendents running crews across two offices, a fleet with its own manager, and a sister company coming for utility and power work. What every shop that size still has is a gap between the field and the office: what the crews did today reaches the people who bill it, schedule it, and answer for it a day late, through a phone, a text thread, and a spreadsheet somebody rebuilds every morning.

Blue lives in that gap. It's an AI operations employee on a box at your shop that every foreman, superintendent and office person can text. It keeps the 811 book current, builds the daily production sheet, answers spec questions to the page, turns prints into quote inputs, holds the master schedule, and feeds the office what the field did today — in real time, in the systems you already run. Finance, quoting, scheduling support are all in the library; you decide what it touches and when. No app. No login. No network integration required.
02 · THE PROBLEM IT KILLS

Every bore is a ticket on a 20-day clock — and the office finds out tomorrow

A turnkey fiber shop generates coordination faster than a phone tree can carry it. Indiana 811 tickets live 20 days with two working days' notice, and every crew holds a stack with staggered update-by dates. The daily production report is rebuilt every morning by texting every foreman and waiting. A drill operator with a depth question calls the super, who calls the office. Footage bored and splices closed today show up in billing next week. Meanwhile a three-person crew is standing.

01 · STANDBY

Crews waiting on answers

A locate status, a spec, a go/no-go — every round trip through the super idles a crew you're already paying. That's the line closest to real money, and it's the one we measure.

02 · THE 20-DAY CLOCK

Tickets that lapse mid-job

Telecom work causes roughly 60% of all HDD utility strikes nationally, and an expired or never-updated ticket is the classic root cause. Your clients and your insurer know that number too.

03 · THE LAG

Field truth reaches the office late

Quantities, job-done, receipts, change conditions, who worked where — all of it exists at 4pm on a foreman's phone and reaches billing, scheduling and payroll's inputs a day or a week later, retyped.

This isn't hypothetical for us. Blue runs this loop today for a utility-line contractor's Indianapolis unit — one GF, ten foremen, ~400 locate tickets tracked, a daily crew sheet emailed to the client's distribution, a 65-document spec-and-safety library answered to the page. Every scenario on this page is that machinery, pointed at fiber.
03 · WHAT BLUE DOES FOR A FIBER CONTRACTOR

Nine jobs, field to office

811 · THE WHOLE BOOK

Locate tickets, proposal to refresh live at a customer

Text a work order and prints; Blue proposes the tickets, draws each dig corridor on a map, and publishes a review page the super approves from the truck. Filing is human-approved, every time. Then Blue runs the clock: a Monday digest per ticket owner — reply ALL and the whole book refreshes. Status by ticket number, positive-response read-back, and a hard warning before a crew breaks ground on a dead ticket.

PRODUCTION · DAILY

The morning sheet, compiled for you live at a customer

7:15 ask to every foreman, nudge only the ones who haven't answered, compile one sheet (xlsx or PDF) with WR, client, location, crew, UG/OH — released by a named superintendent and emailed to the client's distribution list. "Same as yesterday" is a valid answer.

FIELD → OFFICE

What happened today, in the office today built

Job-done and quantities from the foreman's text land as clean inputs for billing; a supply-house receipt photographed in the truck becomes a drafted bill with a duplicate check; change conditions and delays get logged with a timestamp. The office stops re-keying and starts reviewing.

DOCS · CITED

Spec and safety answers, to the page live at a customer

Load your safety manual, each client's construction standards, splice specs and equipment manuals. Any roster member texts a question and gets the answer with the source page attached. If Blue can't cite it, it says so and routes to the super.

QUOTING · FROM PRINTS

Prints and bid packages → quote inputs pilot

Blue already reads engineering prints to find poles, footage and corridors for 811. Pointed at a bid: takeoff quantities from the print (bore footage, aerial spans, splice points, conduit counts), matched to your unit-price book, drafted into a quote for the estimator to finish — with the bid deadline on the calendar and a reminder before it.

SCHEDULE · CAPACITY

Master schedule and load-balancing input built

Blue holds the crew calendar: what each superintendent is committed to, by week, against the crews and rigs he has. It flags the over- and under-loaded weeks, the weather and ground-condition slips, and drafts the rebalance for the super to approve. A weekly one-pager per unit, and one view across units for whoever runs the master schedule.

DATES · REMINDERS

Permits, tickets, DOT, drill service built

Start-minus-N-day reminders for ROW and county permits, railroad crossings, inspection windows; DOT annuals and driver-file dates; service intervals on drills and plows by hours or dates. The per-unit maintenance scheduler is next on our build list — the reminders themselves run today.

CALL-OUTS · 24/7

Emergency intake that keeps a record pilot

A storm call at 2am gets logged the moment it lands: who called, where, what's down, who's rolling, when they arrived. The super gets the alert; the office gets the record; the client gets a response time you can prove.

OFFICE · WHEN YOU WANT IT

The finance library, on your terms built

Cash-flow forecast, unbilled-work detector, bills-due and vendor-bill capture, monthly and quarterly reviews — the same workflows our owner-operator customers run. Your office decides which to turn on; nothing money-touching happens without a named approver.

04 · A WEEK WITH BLUE

What this looks like on a Precision crew

Every scenario below is a workflow that exists today — most of them running daily at our utility-contractor customer — reframed for fiber construction.

Monday 7:15 AM

The production sheet builds itself built

Blue texts every foreman for today's location, WR, client and crew. By 7:50 it has compiled one sheet, named who hasn't answered, and sent it to the superintendent to release.

Blue: "Sheet's ready — 6 of 7 crews reported. Beltran's crew hasn't answered (nudged twice). Release to the JCFiber list now, or hold 10 minutes?"
Monday 10:05 AM

The 811 refresh digest built

Every WR whose tickets hit their update-by date this week, grouped by whoever filed them. One text, one reply. Blue refreshes the book and records every new ticket number before it moves on.

Blue: "4 WRs need 811 updates before Thursday: 26-088 (3 tickets), 26-091 (2), 26-114 (5), 26-120 (1). Reply ALL, NONE, or ALL BUT <wr>."
Tuesday 1:40 PM

"What's the min depth under the county road?" built

A drill operator asks by text. Blue answers from the client's construction standard — page attached — instead of a phone tree.

Blue: "JCFiber standard §4.3: 48" minimum under county road ROW, 60" under state highway. Page attached. The ditch crossing on that print is INDOT — 60" applies."
Tuesday 4:35 PM

Field truth reaches the office same day built

"Done on 26-091, 1,840' bored, 2 splice cases closed" from the truck. Blue records it against the WR, drafts the billing line for the office, and files the Ferguson receipt photo as a bill draft.

Blue: "Logged 1,840' UG + 2 closures on 26-091. Billing draft ready for the office. Receipt read: $1,212.40, 9 items — drafted, no duplicate found."
Wednesday 6:10 AM

"Are we good to break ground on Smokey Row?" built

Blue reads the ticket's positive response and says which utilities have marked and which haven't. Date-valid and actually-marked are different questions; Blue keeps them separate.

Blue: "Ticket 2608240041 is valid through 9/12. 6 of 7 marked. Duke Energy has not responded — I wouldn't bore the east side yet. Want me to flag it?"
Wednesday 3:00 PM

A bid package arrives as a PDF pilot

Text Blue the prints. It pulls bore footage, aerial spans, splice points and conduit counts off the sheets, matches them to your unit-price book, and drafts the quote for the estimator to finish — deadline on the calendar.

Blue: "SCI Fiber Phase 3 takeoff: 14,200' UG bore, 6,100' aerial, 11 splice points, 3 road bores. Draft quote at your book rates: $412k. Bid due Fri 9/12 — reminder set."
Thursday 9:00 AM

The dates that bite built

County ROW permit for the 135 crossing: 4 weeks out. Two drills due for service by hours. Unit 14's DOT annual is next month. Blue reminds the right person, once, at the right time.

Blue: "For Josh: D24 hit 500 hrs (service due), D19 at 480. Unit 14 annual inspection expires 9/30. Want these on the shop calendar?"
Friday 2:00 PM

Next week's load, balanced built

Blue compiles what every superintendent is committed to next week against crews and rigs, flags the overloaded and the light weeks, and drafts the moves.

Blue: "Next week: Steve's unit is at 6 crew-days over on JCFiber; Bronson's has 2 open days Wed–Thu. Proposed: shift the CR 400 bore to Bronson. Approve, or keep as is?"
Any phone works. Blue runs over standard text messaging — iPhone, Android, company phone or personal. Nobody installs anything, including the crews.
05 · SEE IT ON A PHONE

Three real conversations, start to finish

This is the whole interface. No dashboard, no portal — the same thread a foreman uses to text his super.

811 refresh · Superintendent
10:05
Blue
Monday 811 check — 4 WRs hit their update-by this week:
26-088 · 3 tickets
26-091 · 2
26-114 · 5
26-120 · 1
Reply ALL, NONE, or ALL BUT <wr>.
all but 26-120, that one's done
Got it — refreshing 10 tickets on 26-088, 26-091 and 26-114. 26-120 left to expire. I'll text when the book's current.
Done. 10 of 10 refreshed, new cycle good through 9/18, every new number in the ledger. One heads-up: the portal flagged a similar ticket near 26-114 — it's ours (the adjacent corridor), so no stop.
📄 Refresh receipt · 10 tickets · WR 26-088/091/114
👍
Field → office · Foreman, end of day
4:35
Blue
done on 26-091. 1840 ft bored, closed 2 splice cases
📷 Photo · Ferguson receipt
Logged against WR 26-091: 1,840' UG + 2 closures, 9/1. Billing draft is queued for the office. Receipt read: Ferguson, $1,212.40, 9 items — drafted as a bill, no duplicate on file.
ground was wet on the north end, lost about 2 hrs
Noted a 2-hr ground-condition delay on 26-091 north end, with the time. Steve and the office can see it on tomorrow's sheet. Anything else?
nope
Have a good night. ✅
Spec + ticket check · Drill operator
1:40
Blue
min depth boring under a county road on the jcfiber job?
48" minimum cover under county road ROW per JCFiber construction standard §4.3; 60" under state highway. Page attached.
📄 JCFiber Construction Standards · §4.3 · p.17
and is the ticket good on smokey row
Ticket 2608240041 — valid through 9/12. Positive response: 6 of 7 marked. Duke Energy hasn't responded. I wouldn't bore the east side until they do.
flag it to steve
Flagged to Steve with the ticket and the open utility. I'll text you when Duke marks.

DEMO CONTENT IS ILLUSTRATIVE · A REAL DEPLOYMENT ANSWERS FROM PRECISION'S ACTUAL TICKETS, STANDARDS & ROSTER

06 · WHO TALKS TO BLUE

Role-aware by design — a foreman never sees what a superintendent sees

Every roster member carries a permission set. Blue answers what that person is allowed to know and does what they're allowed to ask for — and nothing customer-facing or money-touching happens without a named approver. Client prints are scoped to the unit working them and audited on every send.

RoleBlue will…Blue won't…
SuperintendentRelease the daily sheet · approve 811 proposals · answer the refresh digest · get call-out alerts · approve schedule moves · change the roster by textFile a ticket or move a job without his approve
Foreman / operatorReport for the sheet · log quantities, job-done and delays · ask spec & safety questions (cited) · check a ticket's status · send a receipt photoSee pricing, finance, or another unit's prints
Estimator / PMGet takeoff drafts from prints · bid-deadline reminders · master-schedule and capacity views across unitsSubmit a bid or commit a crew on its own
HR / SafetyLoad and update safety manuals · audit any answer against the source · get DOT and driver-file remindersMake a safety decision — Blue cites the standard; the qualified person decides
FleetGet service and inspection reminders keyed to units, hours and datesOrder parts or schedule vendors on its own
Office / FinanceReceive field inputs the same day — quantities, job-done, receipts, delays · turn on any of the finance workflows (forecast, unbilled work, bills due, month-end) when wantedSend, pay, or post anything without an approved draft
What Blue never does, for anyone: timekeeping or hours, physical locating, or sending anything to a client or a utility without an approved draft. Those are out of scope on purpose.
07 · WHERE IT LIVES

A box at your shop — not your clients' prints in someone's cloud

Blue runs on a Mac mini we install at the Bargersville shop. Your roster, your 811 ledger, your clients' standards and prints stay on hardware you can point at. We maintain it remotely over a private tunnel; encrypted off-site backup covers theft, fire, or a dead drive.

No network integration required. No domain join, no VPN into your systems, no accounts provisioned, no ports opened. It works on a hotspot if that's what the shop has — our current utility-contractor deployment passed a parent-company IT security review on exactly those terms. If you want it connected to accounting or a field-service system later, that's a scoped step, not a prerequisite. Cancel, and the hardware comes back with the data destroyed and certified.
08 · THE PILOT

One work unit, 90 days, measured

One superintendent and his crews, plus the office people who receive what they produce. Two weeks to baseline how things actually run today, ten weeks live and instrumented, then a scorecard reported as measured — including anything that underperforms.

Weeks 1–2 · Commissioning

Baseline

Documents loaded, unit configured, foremen onboarded by text. We measure today's sheet build time, lookup frequency, locate round-trips and field-to-billing lag before Blue changes anything.

Weeks 3–12 · Live

Instrumented operation

Every question, answer, citation, sheet, ticket and field report is logged with a timestamp. No self-reported numbers.

Day 90 · Scorecard

Measured vs. hypothesis

Hours returned, tickets that lapsed with a crew still on the job, sheet build time, field-to-office lag, citation rate, adoption. Delivered as-is. If the numbers aren't there, we'll say so and pull the box.

MetricTargetWhy it matters
Tickets lapsed with a crew still on the WR0The strike-risk number your clients care about
811 round-trips through the super−60%The most visible daily friction
Daily sheet build time45 min → < 10 minMeasurable every working day
Field event → office recordnext day → same dayQuantities, job-done, receipts, delays
Spec/safety answers cited to the page100% — or Blue declinesYour safety director can audit any answer in seconds
Foreman adoption≥ 75% texting Blue weeklyAn unused tool returns nothing
09 · THE NUMBERS

Pricing

One-time setup
$1,500
Hardware, install, your safety manual and client standards loaded and indexed, your price book and the 811 ledger seeded from current tickets, roster onboarded by text.
Per work unit
$2,500/mo
One superintendent and every foreman, operator and splicer under him, plus the office people who receive their work. No per-seat charges, no usage meters, no overages. Add a unit when the first one earns it.
The terms
90 day pilot
Billed monthly in advance. Cancel any time in the first 90 days on 30 days' notice — exposure never exceeds one month. Hardware retrieved, data destroyed and certified.

For scale: a three-person crew standing 20 minutes twice a day waiting on a locate answer is about $2,000 a month at a $100/hr burdened crew rate — before counting a lapsed ticket, a missed permit window, a bid that went out late, or the superintendent's first hour back. We'll put your rates in the model, not ours.

10 · STRAIGHT ANSWERS

The honest part

What we'd tell a friend before he signed

It's early. Forge is a young Bargersville company with two customers live — a concrete contractor and a utility-line contractor's Indianapolis unit. You'd be the third, and the first fiber shop. You get founder-level attention on your setup, and you'll occasionally see a rough edge before we sand it.

Some of this is proven daily; some is a pilot. The 811 book, the production sheet, the cited answers, the reminders and the field-to-office inputs run today. Quoting from prints and cross-unit capacity balancing use the same machinery pointed at new work — we'd build them with your estimator and your supers in the loop, and we've labeled them that way on this page.

The 811 filing itself stays human-approved. Blue proposes, draws, publishes the review page, and runs the refresh clock. A person hits approve on every filing. We think that's the right posture for a long time.

Blue doesn't make safety decisions or submit bids. It surfaces the cited standard and drafts the numbers; the qualified worker and the estimator decide. It also won't do timekeeping or hours — deliberately out of scope.

11 · NEXT STEP

Bargersville to Bargersville

We're a family company a few miles down the road, built for operators who came up through the work. The three phones above aren't a storyboard — that's the product doing the job the way it does it every day. Starting is the same motion: a text. Say the word and inside two weeks Blue is on a box at the shop, your standards loaded, one unit's crews texting it — with 90 days to prove it's the best field hire you never had to make.

Zack Kikendall · Forge AI · [email protected] · (317) 698-3371 — one text starts it.